Service Recovery: Unexpected Replication Delay

Summary Check replication health and pending writes. Confirm the affected service, incident owner and current processing load before selecting the recovery procedure.
Author Julian Varma
Source Type Torch Interview
Category HARD
Tags fictional-demo
Created 2026-11-12 10:00:00

📖 Process Description (Narrative Version)

Check replication health and pending writes. Confirm the affected service, incident owner and current processing load before selecting the recovery procedure. When the standby falls outside the approved recovery range, the team does not apply the usual promotion sequence. The on-call engineer escalates to the database owner, checks downstream queue status and follows the incident-specific recovery path.

📋 Process Steps (Structured)

  1. Confirm the affected service and incident owner in the incident channel. Ask the incident coordinator to record the scope before any recovery change.
    Tools: Incident channel, Service inventory
    Timing: At the start of the incident
  2. Check replication health, pending writes and the current processing load. Compare the standby state with the approved recovery range in the service runbook.
    Tools: PostgreSQL monitoring, Service runbook
    Timing: Before choosing the recovery procedure
  3. When the standby falls outside the approved recovery range, the team does not apply the usual promotion sequence. The on-call engineer escalates to the database owner, checks downstream queue status and follows the incident-specific recovery path.
    Tools: Incident channel, Queue monitoring
    Timing: When the standby is outside the approved recovery range
  4. Ask the database owner to confirm the recovery action and its rollback conditions. Record the decision and the observations used to make it in the incident notes.
    Tools: Service runbook, Incident notes
    Timing: Before applying the approved change
  5. After the approved action, check replication state and downstream processing with the incident coordinator. Keep the incident open until the service owner confirms recovery.
    Tools: PostgreSQL monitoring, Queue monitoring
    Timing: After the recovery action
  6. Update the handover notes with the exceptional condition, the responsible roles and the approved runbook reference. Ask the database owner to resolve the remaining threshold question.
    Tools: Knowledge Hub, Service runbook
    Timing: During handover

⚠️ Missing Information

Warning

This process requires follow-up interview.